Farr Step By Step
-
-
Clean & Prep Existing Roof (Broom & Blow Option)
-
-
Clean & Prep Existing Roof (Wash Option)
-
-
Drains Before
-
-
Drains After (#800 Elastic Cement)
-
-
Skylight, wrap and flash. (#800 Elastic Cement)
-
-
Reinforce ponding area.
-
-
Pitch Pockets before
-
-
Pitch Pockets after (#800 Elastic Cement)
-
-
Pipe stands and supports (#800 Elastic Cement)
-
-
Repair splits, blisters ect. (#800 Elastic Cement)
-
-
Walls & Drains Before
-
-
Walls & Drains After
-
-
Application of Membrane (Polyester & Emulsion)
-
-
Application of Membrane (Polyester & Emulsion)
-
-
Application of Membrane (Polyester & Emulsion)
-
-
Application of Membrane including walls (Polyester & Emulsion)
-
-
Application of Membrane (Polyester & ElastaHyde)
-
-
Application of Membrane (Polyester & ElastaHyde)
-
-
Reflective Surface Coating is Applied (ElastaHyde)
-
-
Reflective Surface Coating is Applied (ElastaHyde)
-
-
Reflective Surface Coating is Applied (ElastaHyde)
-
-
Reflective Surface Coating is Applied (ElastaHyde)
-
-
A Completed System
-
-
A Completed System
-
-
A Completed System
-
-
A Completed System
-
-
Completed System (Including Seamless Walkway Coating)
-
-
A Completed System