PROJECT PROFILES & CASE STUDIES

PROJECT PROFILE – Trinity Baptist Church

The person on the ground might not be able to see it, but we know that Trinity Baptist Church in San Antonio has a great quality new roof. This 300 square foot gravel roof was restored with a “bulletproof” 3- ply, ultra-robust FARR system and is now eligible for a

Read More »
San Antonio Hut rehab
PROJECT PROFILE – San Antonio Hut Rehab

It took all the specifications and details that Western Colloid could recommend to turn this eyesore into a respectable member of the community. Adjacent to the Fort Sam Houston army base this former military Quonset hut was smack in the middle of a residential neighborhood. This project required something more

Read More »
PROJECT PROFILE – Southwest Research Institute

Southwest Research Institute, SWRI Building B87 Here is the story of the building roof that had it all and the happy ending it deserved! This particular gravel roof is on one of hundreds of structures at a 1200-acre research facility.  It had all the familiar challenges but amplified.  The ponding

Read More »
PROJECT PROFILE – Youth Detention Center

Original roof assembly: Multiple systems; BUR Cap Sheet, EPDM & Modified Bitumen. A great story about weather, high altitude, multiple substrates, and the perfect problem solving solution. Project Challenges This New Mexico project had multiple roof elevations with leaking roofs that had little roof life remaining. With time constraints, the

Read More »
PROJECT PROFILE – Pacific Design Center

Something about Rocks and Glass Houses and a Worn Out Roof. Project Challenges – With the all-glass construction of the Pacific Design Center combined with lack of access, not to mention the additional cost and danger of tearing off a coal tar pitch substrate, this job needed all the experts.

Read More »
PROJECT PROFILE – 600 W. Broadway, San Diego

This is such a special project in so many ways.  First, of all it’s a roof at street level.  Second, it looks so interesting. What do you do with a roof that downtown San Diego Street traffic sees?  You do your best to make it aesthetically pleasing.  This 6000 square

Read More »
Reno-Sparks Convention Center
PROJECT PROFILE – Reno Sparks Convention Center

Roof Consultant:  Benchmark Roof and Pavement Consultants Contractor:  D&D Roofing and Sheet Metal Sparks, Nevada  Job location:  Reno, Nevada Original roof assembly:  TPO Duration: 4 weeks Products Used: Western Colloid #298, #720, #800, Polyester Fabric. Specification SM-2p XE Objective – Provide the convention center with a cool, sustainable, watertight, FM

Read More »
restore the roofs at warner brothers
PROJECT PROFILE – Warner Brothers Studios

Western Colloid is “Almost Famous” from supplying roof products to this working studio. Western Colloid has been working with Best Contracting from Los Angeles, California for the past few years as we restore the roofs on Warner Brothers working soundstages.  At any time, each building, has a TV show or

Read More »
PROJECT PROFILE – Iconic Jobs

We have quite a collection of Iconic projects in our library. The beautiful thing about Western Colloid products is its Versatility and Adaptability.  This allows us to provide good quality product over a variety of substrates, with uncommon elevations, along with allowing the contractor to adapt to the many installation

Read More »
Western Colloid Hi-Rises
PROJECT PROFILE – High Rises!

The thrill, the danger, the view! Re-roofing a high rise takes a particular set of skills. Getting the contractors their roofing products takes another. Whether it’s the painstaking work of bucket by bucket up a freight elevator or coordinating with a crane in the middle of the night Western Colloid,

Read More »
PROJECT PROFILE – Vista Village Shopping Center

This project is a terrific example of adaptability.  This area known as Vista Village is home to shops, restaurants, and businesses and it consists of many buildings, each with different roof substrates.  It is also open 365 days a year so roofing and shopping had to happen simultaneously. Although the

Read More »
PROJECT PROFILE – Denver High Rise

This 10-story building, originally built in 1962, was being transformed to artist lofts, apartments, and roof top lounge. With its multiple substrates, multiple roof elevations, and multiple change orders, this job was a real challenge and a complete work in process, literally. It was necessary to create different roof system

Read More »
roof restoration
Roof Restoration Story – A Record Setting Roof

Each day we can follow a roofing project that is installing another layer of protection and reconditioning an existing Western Colloid system. Our founder, Larry Widmer began applying coatings and fluid applied systems in the 1960’s. Throughout the West notable companies like Boeing, Weyerhaeuser, Fred Meyers, TRW, Certified Grocers, Payless,

Read More »
custom color
PROJECT PROFILE – Cornerstone Baptist Church

This Texas church had a big problem.  It had a failing metal roof with a custom color, an insurance claim with time constraints, and it was in the middle of covid. The costly process of replacing the panels was not possible due to the covid supply chain issues.  But the

Read More »
PROJECT PROFILE – Cypress Office Building

Original Substrate: BUR with Gravel As time marches on for our 50-year-old company, Western Colloid is now involved in roof ‘reconditioning’ projects more and more.  A great example is our featured project below. In 2009 Bligh Pacific Roofing in Southern California was tasked with reroofing a gravel roof on a

Read More »
PROJECT PROFILE – Phillips Building

Original Substrate – Two layers BUR Every once in a while, you want to feature a project just because it’s so pretty.  We are assuming that by reading this project profile that you are a roofing professional that wants to be inspired by challenges and solutions.  Sometimes it’s nice just

Read More »
PROJECT PROFILE – Fox Studios

Original roof assembly:BUR Cap sheet, SPF with unknown coating. Project Challenges This historic building was originally built in the 1920s with multiple additions to it throughout the years, each with different elevations and roof compositions.  There was as much as 30 foot difference in height with old brick wall construction

Read More »
PROJECT PROFILE – Crumley Residence

PROJECT PROFILE The Crumley Residence was built in the mid-century modern style in 1951.  It was designed by the prestigious Corpus Christi architectural firm Wisznia. The design of the home is so unique it’s treated as an iconic and historic home for the area. The roof area is over 100

Read More »
PROJECT PROFILE – Alhambra Police Department

Original Assembly: Rock/Gravel Roof over BUR This Southern California Police station came with its own set of challenges. This project was a Western Colloid specified roof using our GR-2P-24-XE Specification, but the most challenging aspect was the bidding process in the middle of the covid restrictions.  Our Training and Technical

Read More »
PROJECT PROFILE – Mission Tortilla

When the warranty was about to expire on this 10-year-old Western Colloid roof restoration the next steps were clear, let’s give it another 10 years.  In fact, the roof was able to quality for an additional 15-year warranty.  Why?  This building owner did everything right in performing regular roof maintenance

Read More »
fully restored watertight cool roof-7
PROJECT PROFILE – Citrus College Hospital

Original roof assembly: Built-Up Roofing Duration of job:  6 Weeks Project Challenges Bob, the Facility Manager at Citrus College Hospital, needed a clean and unobtrusive roof option that would meet the warranty needs of the organization but not disrupt the daily operations of the hospital or disturb the patients.  He

Read More »
Case Study: Methodist Church Commercial Roof in Illinois

This commercial roof in Illinois had a lot of unique challenges! Here’s what we did for this historic United Methodist Grace Church in Salem, Illinois.   Obstacles to Overcome The United Methodist Grace Church needed to be re-roofed. However, it was anything but a straightforward project! Here are the five

Read More »
commercial roof in texas
Case Study: Frito-Lay commercial roof in Texas

When the Frito-Lay corporate headquarters needed a new commercial roof in Texas we were more than happy to help! Read on to see what services we provided this global company. Problems of Original Roof To begin, the company’s original roof was about 32 years old. It was a concrete deck

Read More »
STAPLES CENTER VIDEO
Our Favorite Fluid-Applied Roofing Projects in California

As the third-largest state in the United States, California covers a vast geographic area and enjoys varied weather and climates. From high altitudes to the desert, foggy coastlines to endless sunshine and everything in between, there is no one-size-fits-all solution when it comes to building materials in California. Building owners

Read More »
Showing the coating being removed
Medina Avenue Warehouse Metal Roof

Job Location:  Tucson, Arizona Original Roof Assembly:  Metal Roof Deck Duration:  60 Days Products Used:  #720 ElastaHyde Acrylic Elastomeric Reflective Coating, #800 Elastic Cement Project Challenges: This Tucson Warehouse had a one year old roof that was failing. The roof was a reinforced acrylic coating over a metal roof. The

Read More »
Totes being delivered
High Rise Office Building – Irvine, California

Duration:  5 Weeks   CHALLENGES Every aspect of this project was challenging except the choice of Western Colloid’s FARR System. The first challenge was deciding on the best course of action to get the materials on the roof.  Generally for a single to three-story building pumping the coatings on the

Read More »
Grace United Methodist Church, Salem llinois
Grace United Methodist Church, Salem llinois

Contractor:  Jewett Roofing of Greenville, Illinois Original Roof Assembly:  BUR Size:  300 Square Feet Project Challenges: When it came time to re-roof this historic church bell tower and steeple there were many obstacles to overcome. The 5 main challenges were: Working with such a small area Roofing an area that

Read More »
Staples Center
Staples Center – Color and Roof Restoration

The Staples Center was originally built in 1999 with a single ply membrane. Based on the height and locations of a large freeway interchange the roof of the arena is visible to millions of travelers a year. The roof of the Staples Center has become an important part of its’

Read More »
Re-roofing Solar Panels
California Department Store Solar Retrofit

Western Colloid provided the roofing system for eighteen department stores. Each building had over 50% of the roof area covered with a new solar system on them but the majority of the buildings’ substrate was old worn TPO with a few EPDM roofs.  Another challenge was some buildings were in

Read More »
Completed project with solar installation
Temple Beth El

Roofing Contractor: Commercial Roof Management Solar Contractor: RA Power and Light Objective: The goal was to install a roof system that can handle the installation and maintenance traffic of a solar system installed on top of it.  The roof system used needs to last the term life of the solar

Read More »
Western Colloid Fluid Applied Reinforced Roofing System
Goodyear Arizona Hospital Complex

Specs Original roof assembly:The original roof was a built-up roofing system, later top-coated with a white acrylic. ChallengesAs a working hospital, the building owners had to choose a system that would have no impact on the operation of business or on the comfort and safety of the patients. Their entire

Read More »
Frito Lay Corporate Headquarters
Frito-Lay Corporate Headquarters

Original roof assembly: concrete deck, 2-1/2 inches rigid insulation, coal-tar and gravel, and BUR and gravel roof assemblies. Existing roof assembly approximately 32 years in age. Experiencing base flashing problems and splitting of the field membrane causing water infiltration into the corporate headquarters building which houses 3,800 employees. Originally, Frito-Lay

Read More »
Pacific Dental Service Building
Pacific Dental Service Building

Pacific Dental Services Building Contractor: Commercial Roof Management Job location: Irvine, California Original roof assembly: EPDM, age unknown. The roof surface was pin holing throughout and had over 100 roof leaks in 124,000 square feet, (1,240 squares). Selection of Western Colloid: Originally the building owners thought that their only option

Read More »
Pacific Dental Service Building
PROJECT PROFILE – PACIFIC DENTAL SERVICES BUILDING

Pacific Dental Services Building Contractor: Commercial Roof Management Job location: Irvine, California Original roof assembly:EPDM, age unknown. The roof surface was pin holing throughout and had over 100 roof leaks in 124,000 square feet, (1,240 squares). Selection of Western Colloid:Originally the building owners thought that their only option was to

Read More »
PROJECT PROFILE: FRITO-LAY CORPORATE HEADQUARTERS

Frito-Lay Corporate Headquarters Contractor: Unified Commercial, Baton Rouge LA Job location: Plano Texas Original roof assembly: concrete deck, 2-1/2 inches rigid insulation, coal-tar and gravel, and BUR and gravel roof assemblies. Selection of Western Colloid: Existing roof assembly approximately 32 years in age. Experiencing base flashing problems and splitting of the field membrane

Read More »
TPO Roofs for Boeing
Boeing

Over 1 million sq. ft. roof receives Western Colloid’s “Cool Roof” system. The unique bulk delivery service and the systems application efficiency made this roof a natural for Western Colloid’s “Fluid Applied Reinforced Roofing” system. How can Western Colloid be of Service? REQUEST A CONSULTATION TRAINING & SUPPORT

Read More »
Western Colloid’s ‘Cool Roof’ System on Ikea
Ikea

Ikea installs Western Colloid’s “Cool Roof” system to protect it’s contents and save on energy bills. How can Western Colloid be of Service? REQUEST A CONSULTATION TRAINING & SUPPORT

Read More »
Hanover - Northern California
Hanover

The extensive amount of equipment on this project made Western Colloid a practical solution for this re-roof. How can Western Colloid be of Service? REQUEST A CONSULTATION TRAINING & SUPPORT

Read More »
Lockheed Martin
Lockheed Martin

A 100,000 sq/ft job for one of the top aerospace firms in the world. One of dozens of buildings at Lockheed using Western Colloid systems. How can Western Colloid be of Service? REQUEST A CONSULTATION TRAINING & SUPPORT

Read More »
Working With Tenants During Roof Tear-Offs
Western Colloid Customers Through The Years

The Irvine CompanyCB Richard EllisWatson Land CompanyArden RealtyPrologisWells Fargo BankCity National BankBank Of AmericaCox CommunicationsSeagate Manufacturing FacilityVons MarketsRalph’s Markets / Food For LessParamount StudiosHome DepotVista PaintsFleishmann PlanetariumWestfield Shopping CentersRandall FarmsTrammell Crow PropertiesThe State of HawaiiCounty of Santa ClaraU.S. Army Supply Depot How can Western Colloid be of Service? REQUEST A

Read More »

How can Western Colloid be of Service?